Advanced, fully permitted, near-term production opportunity
Advanced, fully permitted, near-term production opportunity
- Bell Mountain is a fully permitted, advanced-stage project with a detailed mining plan for a cost-effective, open-pit heap leach operation.
- Exploration includes 297 drill holes for a total of 62,303 feet of drilling and a detailed NI 43-101.
- The project consists of 180 claims, encompassing approx. 1,463 hectares (3,616 acres) of mineral rights. Near-term gold-silver production is pending construction funding.
- Lincoln completed a NI 43-101 Technical Report on the Bell Mountain Project, Updated Preliminary Economic Assessment (PEA). The report was prepared by Welsh Hagen Associates of Reno, Nevada, effective date of July 23, 2024 and reporting date January 6, 2025. Go to the Reports section to view the detailed PEA report.
- Resource estimate summary for total measured and indicated gold equivalent resources of 1,786,600 tons, grading 0.026 opt, containing gold equivalent 45,831 ounces.
- Resource estimate summary for total inferred gold equivalent resources of 1,120,600 tons, grading 0.024 opt, containing gold equivalent 27,147 ounces.
- Great exploration potential along the ridge that supports four gold-silver deposits.
- Go to Bell Mountain Project Description section to view the Resource Statement for the Bell Mountain Project that is presented in the PEA.
Pine Grove
View of the Wheeler Deposit and Mt. Grant in the distance
LOCATION
Lyon County, Western Nevada, USA
Lyon County, Western Nevada, USA
PROFILE
Au, Ag
Au, Ag
STAGE
Advanced, in the final stages of permitting
Advanced, in the final stages of permitting
- Pine Grove is an advanced-stage gold project with two gold deposits in the Pine Grove fault zone that is in the final stages of permitting for an open-pit heap leach operation.
- Discovered in 1866, the property produced 240,000 ounces gold until 1887. Mined high-grade with average > 1 opt gold only down to 160 ft – 180 ft.
- Exploration includes 280 drill holes with 94,380 ft. with a detailed NI 43-101 technical report.
- Resource estimate gold equivalent: 210,962 ounces measured and indicated and Project has one of the highest open pit mineable reserve gold grades in Nevada at 1.23 g/t.
- Permitting will be ongoing in 2025 with anticipated full permitting within the next 12-18 months.
- The technical report states that the project has significant exploration potential beyond current resources.
- Ten drill targets have been identified on the 7 square mile property.
- Only 25% of the property has been explored.
- Go to the Pine Grove Project Description for more information about the project and the Reports section to view the Preliminary Economic Assessment Resource Estimates in the technical report.
Scientific and Technical Disclosure [ + ]
Mr. Paul Saxton, P. Eng. President of Lincoln Gold Mining Inc. and Mr. Joseph Sawyer, P.E., President of the Company’s two U.S. subsidiaries, who supervises the Company's operations in the United States, are the Company’s "qualified persons" (QP) for the purpose of NI 43-101 "Standards of Disclosure for Mineral Projects". Mr. Sawyer is the QP for engineering and environmental disclosure only. Both Mr. Saxton and Mr. Sawyer have reviewed the technical disclosures contained in this section of the Company's website.